Creative Home Improvements

Two Car Heated Garage with Upper Level Master Suite and Breezeway Addition ProjectTwo Car Heated Garage with Upper Level Master Suite and Breezeway Addition Project
This project consisted of adding a two car heated garage, master suite with walk-in closet, full bath, corner gas fireplace and whirlpool tub area. Also included within the upper level breezeway was a small library room and entry hallway leading to the new upper level master suite from the existing home. The breezeway ground level walkway and new rear patio was finished with tinted and stamped concrete . This project added 1514 sq ft of living space to this home in Braintree, MA .This project consisted of adding a two car heated garage, master suite with walk-in closet, full bath, corner gas fireplace and...
Before PhotoBefore Photo
Before New Master Suite AdditionBefore New Master Suite Addition
ExcavationExcavation
Beginning of excavation for new Master suite addition foundationBeginning of excavation for new Master suite addition foundation
Foundation Form WorkFoundation Form Work
New addition foundation form work in progress in preparation for pouring of concrete foundation walls followed by garage floor finishingNew addition foundation form work in progress in preparation for pouring of concrete foundation walls followed by garage floor ...
Garage floor, breezeway walkway and rear patio pouredGarage floor, breezeway walkway and rear patio poured
All foundation and concrete work is now completed and ready for frame construction to beginAll foundation and concrete work is now completed and ready for frame construction to begin
Tinted and Stamped ConcreteTinted and Stamped Concrete
Rear patio and breezway walkway are tinted and stamped concrete where this home owner chose rustic decking that looks like wood planking but is actually concreteRear patio and breezway walkway are tinted and stamped concrete where this home owner chose rustic decking that looks like wood...
Framing UnderwayFraming Underway
Lower level garage framing underwayLower level garage framing underway
Upper level construction underwayUpper level construction underway
The master suite upper lever framing is underway and next is the breezewayThe master suite upper lever framing is underway and next is the breezeway
Exterior Framing CompleteExterior Framing Complete
The exterior framing, sheathing, composite trim installed,windows installed, roofing installed and breezeway constructed with the new addition now being part of the existing homeThe exterior framing, sheathing, composite trim installed,windows installed, roofing installed and breezeway constructed with t...
Siding CompletedSiding Completed
The new addition is now completely sided including the installation of new power, remote control and insulated garage doors and installation of new siding of the front and sides of the existing home to give a new look to the existing home as well as this new additionThe new addition is now completely sided including the installation of new power, remote control and insulated garage doors and...
View from existing front walkwayView from existing front walkway
New driveway finished - completely maintenance free exterior of this new additionNew driveway finished - completely maintenance free exterior of this new addition
View from streetView from street
New driveway finishedNew driveway finished
Interior framing underwayInterior framing underway
Whirlpool tub framingWhirlpool tub framing
Even the Whirlpool tub had its own custom framing for solid supportEven the Whirlpool tub had its own custom framing for solid support
Rough electrical & plumbing underwayRough electrical & plumbing underway
Rough fits are done of the Master Suite gas firplace insert and whirlpool tub and bath shower stallRough fits are done of the Master Suite gas firplace insert and whirlpool tub and bath shower stall
Plastrering completedPlastrering completed
Complete insulation is completed . Blueboard sheathing is installed throughout entire new addition and all is plastered ready for the finishing stages of this addition project to beginComplete insulation is completed . Blueboard sheathing is installed throughout entire new addition and all is plastered ready f...
Garage interior finishedGarage interior finished
5/8" fire rated blueboard was installed as required by local building code for attached garage applications and completely plastered for a neat finish5/8" fire rated blueboard was installed as required by local building code for attached garage applications and completely plas...
Trim and Painting underwayTrim and Painting underway
Finish trim, hardwood flooring, bath and tub area tile installed - Wall and trim paint finish coats next as well as finish coats of solid hardwood flooring throughoutFinish trim, hardwood flooring, bath and tub area tile installed - Wall and trim paint finish coats next as well as finish coat...
Bench seatBench seat
Breezeway upper level bench seat is custom built and ready for finish coats of paintBreezeway upper level bench seat is custom built and ready for finish coats of paint
Bath Built-INBath Built-IN
Master Suite Bath custom built-in is ready for finishingMaster Suite Bath custom built-in is ready for finishing
Master Suite CompletedMaster Suite Completed
This Garage Master Suite with Breezeway Addition Poject is now completed and ready to enjoyThis Garage Master Suite with Breezeway Addition Poject is now completed and ready to enjoy